Campus Pathway

Concrete

5000 PSI

Textured by Contractor

No Staining

No Cracks

365 Day Warranty


Project Details: University campus garden area lounge.  Connecting both student lounge area and the math building.  Contractor applied stain and texture.  Hard stand was spec’d at 490 cubic feet.  Actual metered pour was at 450 cubic feet.